!! History Commons Alert, Exciting News

Profile: Pacific Gas and Electric (PG&E)

Related Entities:

Pacific Gas and Electric (PG&E) was a participant or observer in the following events:

A new six-megawatt solar electricity substation in central California, operated by ARCO Solar, generates enough power for Pacific Gas and Electric (PG&E) to power up to 2,500 homes. [US Department of Energy, 2002 pdf file]

Entity Tags: ARCO Solar, Pacific Gas and Electric

Timeline Tags: US Solar Industry

Pacific Gas and Electric begins operating the first grid-supported PV solar electricity generation system in Kerman, California. The system produces 500 kilowats of power. This “distributed system” allows for greater system reliability and peak-shaving capability. [US Department of Energy, 2002 pdf file]

Entity Tags: Pacific Gas and Electric

Timeline Tags: US Solar Industry

The Ivanpah Solar Electric Generating System, located on 3,500 acres in the Mojave Desert, begins generating electricity. The solar thermal power plant uses a circular array of mirrors to concentrate sunlight at a water-filled central tower. The resulting steam powers turbines, which in turn produce electricity. When fully operational, the Ivanpah plant will feed 377 megawatts of power into two California utilities, Pacific Gas and Electric (PG&E) and Southern California Edison. During some days, the power generated could serve up to 200,000 residential consumers. The project is a partnership between NRG Energy, BrightSource Energy, Google, Bechtel, and the federal government, which leased public land to the plant and provided loan guarantees (see February 2009). Some environmentalists have been sharply critical of the impact on the desert environment (see August 13, 2013), and other critics have asked why a desert solar power plant is not using photovoltaic panels to collect sunlight. NRG Solar president Tom Doyle says, “Given the magnitude and complexity of Ivanpah, it was very important that we successfully complete this milestone showing all systems were on track.” Unit 1 is producing energy; Units 2 and 3 are coming online soon. When fully operational, the three plants will almost double the amount of commercial solar thermal energy capacity now operating in the US. [NRG Solar, 2012; Business Wire, 9/24/2013; Grist Magazine, 9/25/2013]

Entity Tags: Ivanpah Solar Complex, Bechtel, Google, Pacific Gas and Electric, NRG Energy, Tom Doyle, BrightSource Energy, Southern California Edison

Timeline Tags: US Solar Industry

Ordering 

Time period


Email Updates

Receive weekly email updates summarizing what contributors have added to the History Commons database

 
Donate

Developing and maintaining this site is very labor intensive. If you find it useful, please give us a hand and donate what you can.
Donate Now

Volunteer

If you would like to help us with this effort, please contact us. We need help with programming (Java, JDO, mysql, and xml), design, networking, and publicity. If you want to contribute information to this site, click the register link at the top of the page, and start contributing.
Contact Us

Creative Commons License Except where otherwise noted, the textual content of each timeline is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike